Airworthiness Directive 47-30-07
one-timeAirworthiness Directives; certificated, on next periodic inspection but not later than October 1, 1947. In accordance with Figure 1 install a 50-ampere trip
Which aircraft AD 47-30-07 applies to
Applicability gated to aircraft equipped with the specified Spencer Thermostat Co. PLM-50 circuit breaker — confirm exact model/serial from the records
Whether AD 47-30-07 actually applies to your aircraft (by serial and installed parts) and whether it’s already complied with comes from that aircraft’s records.
How AD compliance is recorded
A valid compliance record (14 CFR 43.9) states:
Tailplate reads a tail number’s logbooks and matches every applicable AD — including this one — to its compliance evidence, with recurring next-due dates computed.
Look up a tail number →Applicability is derived from the FAA directive corpus and is advisory, not a legal airworthiness determination. Compliance is established only from an aircraft’s actual records.