Airworthiness Directive 2023-05-17
recurringAirworthiness Directives; General Electric Company Turbofan Engines
What this AD requires
The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) GE90-76B, GE90-85B, GE90-90B, and GE90-94B model turbofan engines. This AD was prompted by a commanded in-flight shutdown (IFSD) due to cracking and rockback of the high- pressure turbine (HPT) stage 2 nozzles resulting in blade liberation, severe rotor imbalance, and liberation of the exhaust centerbody. This AD requires initial and repetitive borescope inspections (BSIs) of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles and, depending on the results of the inspections, removal and replacement of the HPT stage 2 nozzles with parts eligible for installation. As a mandatory terminating action to the repetitive BSIs of the forward platforms of the HPT stage 2 blades or the leading edges of the HPT stage 2 nozzles, this AD requires replacing the HPT stage 2 nozzles. The FAA is issuing this AD to address the unsafe condition on these products.
Which aircraft AD 2023-05-17 applies to
Excludes engines with an installed full set of high-pressure turbine (HPT) stage 2 nozzles, P/N 1847M47G23 and 1847M47G24 (i.e., only engines lacking this full nozzle set are affected).
Whether AD 2023-05-17 actually applies to your aircraft (by serial and installed parts) and whether it’s already complied with comes from that aircraft’s records.
How AD compliance is recorded
A valid compliance record (14 CFR 43.9) states:
Tailplate reads a tail number’s logbooks and matches every applicable AD — including this one — to its compliance evidence, with recurring next-due dates computed.
Look up a tail number →Read the full directive (Federal Register)Applicability is derived from the FAA directive corpus and is advisory, not a legal airworthiness determination. Compliance is established only from an aircraft’s actual records.