Airworthiness Directive 2015-12-10
recurringAirworthiness Directives; Pratt & Whitney Division Turbofan Engines
What this AD requires
We are adopting a new airworthiness directive (AD) for all Pratt & Whitney Division (PW) PW6122A and PW6124A turbofan engines. This AD requires initial and repetitive borescope inspections (BSIs) of the high-pressure compressor (HPC) 7th stage integrally bladed (IB) rotor aft integral arm for cracks until replacement of the HPC 7th stage IB rotor using non-silver-plated nuts. This AD was prompted by reports of crack finds in the HPC 7th stage IB rotor. We are issuing this AD to prevent HPC 7th stage IB rotor fractures, which could lead to uncontained engine failure and damage to the airplane.
Which aircraft AD 2015-12-10 applies to
Applies to engines with high-pressure compressor (HPC) 7th stage integrally bladed (IB) rotor P/N 5495637 installed.
Whether AD 2015-12-10 actually applies to your aircraft (by serial and installed parts) and whether it’s already complied with comes from that aircraft’s records.
How AD compliance is recorded
A valid compliance record (14 CFR 43.9) states:
Tailplate reads a tail number’s logbooks and matches every applicable AD — including this one — to its compliance evidence, with recurring next-due dates computed.
Look up a tail number →Read the full directive (Federal Register)Applicability is derived from the FAA directive corpus and is advisory, not a legal airworthiness determination. Compliance is established only from an aircraft’s actual records.