Airworthiness Directive 2012-18-02

one-time
Official AD 2012-18-02 · FR doc 2012-21722 · 2012-09-11 · airframe

Airworthiness Directives; Agusta S.p.A. Helicopters

What this AD requires

We are adopting a new airworthiness directive (AD) for Agusta S.p.A. (Agusta) Model AB412 and AB412 EP helicopters with certain hoist hook assemblies (hook) installed. This AD requires inspecting the hook for correct assembly of the nut and body. This AD is prompted by a report that a hook separated from the cable of a helicopter. These actions are intended to prevent detachment of the hook from the helicopter and subsequent loss of an external load, possibly resulting in personal injury.

Which aircraft AD 2012-18-02 applies to

Applicability depends on the aircraft’s type certificate — check it against the specific tail.

Whether AD 2012-18-02 actually applies to your aircraft (by serial and installed parts) and whether it’s already complied with comes from that aircraft’s records.

How AD compliance is recorded

A valid compliance record (14 CFR 43.9) states:

Method of complianceThe specific action taken (inspected, replaced, modified) and to what revision.
DateWhen the work was done.
Aircraft timeTotal time in service / tach at compliance — how recurring next-due is computed.
Signature & certificateThe A&P/IA who returned it to service, with certificate number.
Is AD 2012-18-02 complied with on your aircraft?

Tailplate reads a tail number’s logbooks and matches every applicable AD — including this one — to its compliance evidence, with recurring next-due dates computed.

Look up a tail number →Read the full directive (Federal Register)

Applicability is derived from the FAA directive corpus and is advisory, not a legal airworthiness determination. Compliance is established only from an aircraft’s actual records.