Airworthiness Directive 2005-26-06
one-timeAirworthiness Directives; General Electric Company CF6-45A, CF6-50A, CF6-50C, and CF6-50E Series Turbofan Engines
What this AD requires
The FAA is adopting a new airworthiness directive (AD) for General Electric Company (GE) CF6-45A, CF6-50A, CF6-50C, and CF6-50E series turbofan engines. This AD requires removing from service pre-GE Service Bulletin (SB) No. CF6-50S/B 72-1268 configuration low pressure turbine (LPT) stage 2 interstage seal assemblies and stage 3 interstage seal assemblies. This AD also requires installing new or reworked configuration stage 2 interstage seal assemblies and stage 3 interstage seal assemblies. This AD results from reports of fan mid shaft separation, leading to separation of the LPT stage 1 disk, disk overspeed, and uncontained engine failure. We are issuing this AD to prevent uncontained engine failure and damage to the airplane.
Which aircraft AD 2005-26-06 applies to
Whether AD 2005-26-06 actually applies to your aircraft (by serial and installed parts) and whether it’s already complied with comes from that aircraft’s records.
How AD compliance is recorded
A valid compliance record (14 CFR 43.9) states:
Tailplate reads a tail number’s logbooks and matches every applicable AD — including this one — to its compliance evidence, with recurring next-due dates computed.
Look up a tail number →Read the full directive (Federal Register)Applicability is derived from the FAA directive corpus and is advisory, not a legal airworthiness determination. Compliance is established only from an aircraft’s actual records.