Airworthiness Directive 2004-24-09

one-time
Official AD 2004-24-09 · FR doc 04-26424 · 2004-12-01 · turboshaft engine

Airworthiness Directives; Rolls-Royce Corporation (Formerly Allison Engine Company, Allison Gas Turbine Division, and Detroit Diesel Allison) (RRC) 250-B and 250-C Series Turboshaft and Turboprop Engines

What this AD requires

The FAA is adopting a new airworthiness directive (AD) for certain RRC 250-B and 250-C series turboshaft and turboprop engines. This AD requires a onetime inspection of the fuel nozzle screen for contamination, and if contamination is found, inspection and cleaning of the entire aircraft fuel system before further flight. This AD also requires replacing the fuel nozzle with a new design fuel nozzle, at the next fuel nozzle overhaul or by June 30, 2006, whichever occurs first. This AD results from 10 reports of engine power loss with accompanying collapse of the fuel nozzle screen, due to fuel contamination. We are issuing this AD to minimize the risk of sudden loss of engine power and uncommanded shutdown of the engine due to fuel contamination and collapse of the screen in the fuel nozzle.

Which aircraft AD 2004-24-09 applies to

MakesRolls-Royce Corporation
Models250-B15A, 250-B15E, 250-B15G, 250-B17, 250-B17B, 250-B17C, 250-B17D, 250-B17E, 250-B17F, 250-B17F/1, 250-B17F/2, 250-C18, 250-C18A, 250-C18B, 250-C18C, 250-C20, 250-C20B, 250-C20C, 250-C20F, 250-C20J, 250-C20R, 250-C20R/1, 250-C20R/2, 250-C20R/4, 250-C20S, 250-C20W, 250-C28, 250-C28B, 250-C28C, 250-C30, 250-C30G, 250-C30G/2, 250-C30M, 250-C30P, 250-C30R, 250-C30R/1, 250-C30R/3, 250-C30R/3M, 250-C30S, 250-C30U, 250-C40B, 250-C47B, 250-C47M, 250-B, 250-C

Applies to all 250-B and 250-C series turboshaft AND turboprop engines listed in AD Table 1 (formerly Allison Engine Company / Allison Gas Turbine Division / Detroit Diesel Allison); no serial number or part number restriction stated.

Whether AD 2004-24-09 actually applies to your aircraft (by serial and installed parts) and whether it’s already complied with comes from that aircraft’s records.

How AD compliance is recorded

A valid compliance record (14 CFR 43.9) states:

Method of complianceThe specific action taken (inspected, replaced, modified) and to what revision.
DateWhen the work was done.
Aircraft timeTotal time in service / tach at compliance — how recurring next-due is computed.
Signature & certificateThe A&P/IA who returned it to service, with certificate number.
Is AD 2004-24-09 complied with on your aircraft?

Tailplate reads a tail number’s logbooks and matches every applicable AD — including this one — to its compliance evidence, with recurring next-due dates computed.

Look up a tail number →Read the full directive (Federal Register)

Applicability is derived from the FAA directive corpus and is advisory, not a legal airworthiness determination. Compliance is established only from an aircraft’s actual records.